Site walk · front entry redesign + drainage
Derek · structured summary ready · estimate draft pending approval
Good morning, Derek.
Four crews out today. Anderson estimate is live. Monday order batch ready for review.
Active Jobs
11
↗ 3 starting this week
Estimates Pending
4
2 drafts awaiting review
Monday Order Batch
$8.4k
Ready — 4 suppliers
Open Variances
2
Anderson · Novak
Today's Pulse
Live crew status · mid-day
CREW A
Miguel Torres · 4 of 6 stops complete. Holloway drainage taking longer than estimated.
At risk
CREW B
Carlos Ruiz · Daily maintenance route — Kenilworth + Winnetka. 3 of 5 complete.
On track
CREW C
Javier Morales · Novak hydrangea install. Finished early.
Complete
Recent Site Walks
Awaiting your review
-
Holloway · Lake ForestToday 10:47am
-
Moretti · KenilworthYesterday
-
Lindqvist · GlencoeApr 20
Quick Actions
The things you do most days
→ Site Walk
Open capture surface. Customer picker ready.
→ Monday Orders
Review 4 supplier drafts · $8,432 total
→ Variance Queue
Anderson · +2 hydrangea propagating now
New Site Walk
Talk, tap, submit — the rest handles itself.
Tap to record
30 seconds to 3 minutes · scope, observations, measurements
front entry
drainage
east bed
+ add
New estimate
Maintenance
Variance
Customer request
✓ Structured · 1m ago
Holloway — Lake Forest
Proposed Scope
- Remove and replace 5 boxwood (tired, leggy)
- Install 4 Annabelle hydrangea · front bed
- Regrade east driveway drainage · ~12 ft run
- Install 4 in-ground path lights · front walk
- Seasonal floral program · spring rotation
- Mulch refresh · all beds (3 cubic yards)
Material Implications
- 4 × Annabelle hydrangea, 3 gal (Midwest Groundcovers)
- 5 × boxwood, Green Velvet, 3 gal
- 4 × path light, warm LED (ProGreen Supply)
- 3 cu yd shredded hardwood mulch
Rough Labor
≈ 22 hours · 2-person crew · 1.5 days
Question to confirm: Annabelle vs. Limelight hydrangea? Photo reference suggests classic white — Annabelle is closer match. Confirm before draft.
Week of April 20 – 26, 2026
Mon20
Tue22
Wed23
Thu24
Fri25
Sat26
Sun27
Crew AMiguel
Anderson
Reynolds
Holloway
Chen
Moretti
Anderson
Lindqvist
Holloway
Reynolds
Crew BCarlos
Route 1
Route 2
Route 1
Route 3
Route 2
Crew CJavier
Novak
Novak
Novak
Novak
Moretti
Anderson
Scheduled
Complete
At risk
Blocked · material
This week's order batch
Drafted from accepted estimates, weekly maintenance, and last week's variance top-offs. Review, adjust, send.
Midwest Groundcovers
Estimated
$2,840
-
Annabelle hydrangea · 3 gal8ea$312
-
Boxwood Green Velvet · 3 gal12ea$348
-
Hosta Patriot · 1 gal24ea$288
-
Karl Foerster grass · 3 gal18ea$432
-
Shredded hardwood mulch14cu yd$560
Sourced from: Holloway estimate (4) · Anderson variance (+2 Annabelle) · Moretti floral rotation · standard weekly mulch
Ball Seed
Estimated
$1,870
- Impatiens Super Elfin · mixed12flats$384
- Begonia Dragon Wing · red8flats$288
- Coleus Kong Rose6flats$216
- Sweet potato vine · chartreuse10flats$340
- Spike dracaena24ea$192
- Euphorbia Diamond Frost14ea$126
- Potting soil, pro mix · 2 cu ft18bags$324
Sourced from: Moretti spring rotation · Anderson seasonal program · 6 maintenance-route container refreshes
ProGreen Landscape Supply
Estimated
$2,410
- In-ground path light · warm LED8ea$624
- Drainage pipe · 4" perforated40ft$180
- #57 gravel2tons$210
- Landscape fabric · pro grade1roll$148
- Edger · steel · 4"200ft$1,248
Sourced from: Holloway drainage regrade · Holloway path lighting · Lindqvist drainage scope
Chalet Wholesale
Estimated
$1,312
- Boxwood Winter Gem · 5 gal6ea$432
- Japanese maple 'Crimson Queen' · specimen1ea$485
- Catmint Walker's Low · 1 gal22ea$198
- Salvia May Night · 1 gal18ea$197
Sourced from: Novak design install · Reynolds border refresh
Anderson
Scranton Ave · Winnetka
Holloway
Sheridan Rd · Lake Forest
Moretti
Ridge Ave · Kenilworth
Lindqvist
Park Ave · Glencoe
Novak
Ravine Dr · Highland Park
Chen
Forest Ave · Wilmette
Reynolds
Lake Rd · Lake Bluff
Holloway
Sheridan Road · Lake Forest, IL
Property
3.2 acres
Client since
2024
Annual
$42k
Last visit
Today
Recent activity
2026-04-22
—
2026-04-15
Maintenance visit
Crew A · spring cleanup · mulch refresh 4 cu yd
Crew A · spring cleanup · mulch refresh 4 cu yd
$1,240
2026-04-01
Annual contract renewed
Full-service maintenance · 2026 season
Full-service maintenance · 2026 season
$38,400
2025-11-12
Holiday lighting install
Front facade + 4 specimen trees
Front facade + 4 specimen trees
$4,850
2025-09-24
Fall color rotation
Mums · 18 containers · front and back
Mums · 18 containers · front and back
$1,680
Photos · from site walks and visits
front entry
east bed
drainage
existing hydrangea
north walkway
Outstanding items
Open
Confirm: Annabelle vs. Limelight hydrangea
Flagged from today's site walk · awaiting Derek's answer
Flagged from today's site walk · awaiting Derek's answer
Open
Estimate draft · front entry redesign
Pending review before send to client
Pending review before send to client
~$14k
Variance queue
Field quantities that diverged from the estimate. Each one propagates through the systems that care. Review. Approve. Move on.
Anderson · Hydrangea install
+2 · Annabelle hydrangea
Estimate scoped 15 hydrangea. Crew planted 17 (two corners needed additional filling — confirmed at site with Mrs. Anderson). Variance captured at tap-time; Claude proposed reconciliation across four systems.
LMN Estimate
✓ Updated · +2 units
QuickBooks invoice
✓ Adjusted · +$78
Next order batch
✓ +2 added to Monday draft
Customer comm
⏳ Draft ready · awaiting send
Novak · Design install · path lights
Material delivery delayed
ProGreen Supply path lights scheduled Wed delivery, now delayed to Thursday morning. Crew C Wednesday blocked on Novak. Schedule auto-updated — Wednesday Novak slot reassigned to field prep; install moves to Thursday afternoon.
Supplier confirmed
✓ Thu 8am delivery
Schedule adjusted
✓ Thu 1pm install slot
Crew briefed
✓ Javier notified
Customer comm
⏳ Draft: "Path lights arriving Thu..."
Crew lead view · today's work
What a crew lead sees on their phone. Pre-loaded by 6am. Tap-to-confirm as work completes.
Crew A · Miguel
Tuesday, April 22 · 6 stops today
2 of 6 complete · 4 remaining
Reynolds · Lake Bluff
Lake Rd — 7:30am
Done 9:45am
-
Maintenance · weeklymow · edge · blow · 2.5 hrs
Chen · Wilmette
Forest Ave — 10:00am
Done 11:10am
-
Maintenance · weeklymow · edge · blow
Holloway · Lake Forest
Sheridan Rd — 11:45am
In progress
-
East driveway · regrade 12 ftdrainage pipe · gravel · complete
-
Remove boxwood · 5 unitsfront bed · leggy, tired specimens
-
Install Annabelle hydrangea · 4 unitsfront bed · 3 gal · corners first
-
Path lights · 4 unitsfront walk · 8 ft spacing · warm LED
Anderson · Winnetka
Scranton Ave — 3:00pm
Next up
-
Hydrangea install · 15 unitseast border · stake as you go
-
Mulch refresh · 3 cu ydall beds · 2 in depth
Reynolds · Lake Bluff
Lake Rd — 5:30pm · quick stop
6:15pm est
-
Hose sweepclient requested — back patio
Same codebase, same login. Just scoped to Miguel's crew and today's work.